Place pedal back into base and from the bottom, install the four black screws that secure the pedal to the base.
Slide the connectors onto the PCB.For standard use:Red wire to +VWhite wire to SIGBlack wire to GNDIf using the Bodnar Controller:Red wire to GNDWhite wire to SIGBlack wire to +V
Paying attention to the wires and their locations, reassemble the unit. Install screws on the bottom.
Install the pedal pads and your done. You may now plug it in and calibrate.